Automated 2-in-1 blasting cell that depowders and surface-finishes powder-bed 3D-printed parts in one enclosed, software-controlled cycle.
On backorder
· Lead time: 6–9 weeks — built to order. Install and operator training included.
Fully automated continuous blasting line that cleans and surface-finishes whole powder-bed print jobs in 24/7 operation — load a full build, walk away.
On backorder
· Lead time: 8–14 weeks — built & configured to order. Install, line integration and training included.Upload your file or talk to an engineer — no obligation, no spam, NDA standard. First-time customers get free DfAM review and free U.S. shipping.
Engineer-reviewed · Confidential · Fast response
Engineer-reviewed · Confidential · Fast response
Engineer-reviewed · Confidential · Fast response
Engineer-reviewed · Confidential · Fast response
Engineer-reviewed · Confidential · Fast response
Please describe your part and scanning needs. Include details like size, material, and how you plan to use the 3D model. Let us know if you require additional services like digital sculpting. Upload images of your part(s) if you have them.
Engineer-reviewed · Confidential · Fast response
Upload your CAD file or describe your project — our engineers will follow up shortly.
Engineer-reviewed · Confidential · Fast response
Engineer-reviewed · Confidential · Fast response