Discover AM Solutions at Additive Plus, providing advanced 3D printing technologies for industrial and professional applications. From high-precision 3D printers to versatile materials and innovative processes, AM Solutions empowers engineers, designers, and manufacturers to produce prototypes, functional parts, and complex components with exceptional accuracy and efficiency. Elevate your additive manufacturing projects with scalable, reliable, and cutting-edge 3D printing solutions tailored to accelerate innovation and optimize production workflows.
Automated cleaning system for large SLA 3D-printed parts and build platforms — a compound immersion process that cleans and loosens supports without IPA or critical solvents.
Made to order
· Lead time: 6–10 weeks — built & configured to order. Install and operator training included.
Benchtop automated system that removes support structures and cleans uncured resin from delicate photopolymer 3D-printed parts — a compound dip process with no IPA or critical solvents.
Made to order
· Lead time: 5–8 weeks — built to order. Install and operator training included.
Entry-level automated vibratory finishing system that deburrs, smooths and cleans 3D-printed parts with a high-frequency processing bowl — a cost-effective way to bring finishing in-house.
Made to order
· Lead time: 5–8 weeks — built to order. Install and operator training included.
Entry-level automated vibratory (mass) finishing system for small 3D-printed metal and plastic parts up to 70×70×25 mm — 20 L work container, integrated 25 L closed-loop process-water tank, plug-and-play 230 V. Smoothing, deburring, polishing, and matt finishing for SLA, SLS, MJF, HSS, SAF, and SLM parts.
Made to order
· 4-6 weeks
Made to order
· Lead time: 6–9 weeks — built to order. Install and operator training included.
Automated wet-blasting cell that cleans and surface-finishes metal and polymer 3D-printed parts with a water-media slurry — dust-free, spark-free, no ATEX compliance needed.
Made to order
· Lead time: 8–12 weeks — built & configured to order. Install and operator training included.
Automated 2-in-1 blasting cell that depowders and surface-finishes powder-bed 3D-printed parts in one enclosed, software-controlled cycle.
Made to order
· Lead time: 6–9 weeks — built to order. Install and operator training included.
Fully automated continuous blasting line that cleans and surface-finishes whole powder-bed print jobs in 24/7 operation — load a full build, walk away.
Made to order
· Lead time: 8–14 weeks — built & configured to order. Install, line integration and training included.Upload your file or talk to an engineer — no obligation, no spam, NDA standard. First-time customers get free DfAM review.
Get Instant Quote
Engineer-reviewed · Confidential · Fast response