AM Solutions
Discover AM Solutions at Additive Plus, providing advanced 3D printing technologies for industrial and professional applications. From high-precision 3D printers to versatile materials and innovative processes, AM Solutions empowers engineers, designers, and manufacturers to produce prototypes, functional parts, and complex components with exceptional accuracy and efficiency. Elevate your additive manufacturing projects with scalable, reliable, and cutting-edge 3D printing solutions tailored to accelerate innovation and optimize production workflows.
Automated cleaning system for large SLA 3D-printed parts and build platforms — a compound immersion process that cleans and loosens supports without IPA or critical solvents.
- ✓ IPA-free cleaning of large SLA parts up to 750 × 750 × 550 mm
- ✓ Auto-cleans the build platform · loosens supports for easy removal
- ✓ Lead time: 4–8 weeks — built & configured to order
Made to order
· Ships in 4–8 weeks — built to order. Install and operator training included.
Benchtop automated system that removes support structures and cleans uncured resin from delicate photopolymer 3D-printed parts — a compound dip process with no IPA or critical solvents.
- ✓ Automated support removal + cleaning for SLA / DLP / PolyJet parts
- ✓ IPA-free compound · 230 V plug-and-play benchtop
- ✓ Lead time: 4–8 weeks — built to order · install + training included
Made to order
· Ships in 4–8 weeks — built to order. Install and operator training included.
Entry-level automated vibratory finishing system that deburrs, smooths and cleans 3D-printed parts with a high-frequency processing bowl — a cost-effective way to bring finishing in-house.
- ✓ Automated deburr, smooth and clean for metal and plastic parts
- ✓ High-frequency 3,600 RPM bowl · quiet ≤78 dB(A)
- ✓ Lead time: 4–8 weeks — built to order · install + training included
- ✓ Starter consumable included — 25 L of finishing media, ready to run out of the box
Made to order
· Ships in 4–8 weeks — built to order. Install and operator training included.
Entry-level automated vibratory (mass) finishing system for small 3D-printed metal and plastic parts up to 70×70×25 mm — 20 L work container, integrated 25 L closed-loop process-water tank, plug-and-play 230 V. Smoothing, deburring, polishing, and matt finishing for SLA, SLS, MJF, HSS, SAF, and SLM parts.
- ✓ Automated vibratory finishing — smoothing, deburring, polishing, and matt finish in one cycle
- ✓ Closed-loop 25 L process water — separates solids, no drain or fresh-water hookup, low running cost
- ✓ Lead time: 4–8 weeks — configured to order, installed and supported from California
Made to order
· Ships in 4–8 weeks — built to order.
Mobile 2-in-1 vibratory mass-finishing system that deburrs, smooths and cleans metal and plastic 3D-printed parts with an integrated cleaning centrifuge and water recycling — no plumbing needed.
- ✓ Deburr, smooth, matte and clean in one 120 L machine
- ✓ Integrated water treatment — plug-and-play, <69 dB(A)
- ✓ Lead time: 4–8 weeks — built to order · install + training included
- ✓ Starter consumable included — 75 L of finishing media, ready to run out of the box
Made to order
· Ships in 4–8 weeks — built to order. Install and operator training included.
Automated wet-blasting cell that cleans and surface-finishes metal and polymer 3D-printed parts with a water-media slurry — dust-free, spark-free, no ATEX compliance needed.
- ✓ Wet blasting for metal LPBF parts + polymers — no dust, no ATEX
- ✓ PLC recipes, closed-loop water + media recycling
- ✓ Lead time: 4–8 weeks — built & configured to order
Made to order
· Ships in 4–8 weeks — built to order. Install and operator training included.
Automated 2-in-1 blasting cell that depowders and surface-finishes powder-bed 3D-printed parts in one enclosed, software-controlled cycle.
- ✓ Depowdering + surface finishing in one ATEX-compliant cell
- ✓ Polymer PBF (SLS, MJF, HSS, SAF) + de-powdered metal parts
- ✓ Lead time: 4–8 weeks — built to order · install + training included
Made to order
· Ships in 4–8 weeks — built to order. Install and operator training included.
Fully automated continuous blasting line that cleans and surface-finishes whole powder-bed print jobs in 24/7 operation — load a full build, walk away.
- ✓ Continuous 24/7 depowdering + surface finishing, hands-free
- ✓ 5-nozzle PU loop belt + rotary screen drum · SLS / MJF / HSS, any brand
- ✓ Lead time: 4–8 weeks — built & configured to order
Made to order
· Ships in 4–8 weeks — built to order. Install, line integration and training included.Not sure which system fits?
Tell us your application. We'll send our top recommendation.
Browse all categories
Printers, materials, print services and lab equipment — including AO Metal, the LPBF printer we design and build ourselves.
Have a CAD? Have a quote in 24h.
Upload your file or talk to an engineer — no obligation, no spam, NDA on request. First-time customers get free DfAM review.