Continuous, automated wire feed for your ATO ultrasonic atomizer — standard welding-market wire, reactive or non-reactive, on extended spools.
Made to order
· Lead time 8–12 weeks · installation included
Induction melting in a crucible for your ATO ultrasonic atomizer — atomize feedstock of any shape and keep low-melting-point elements in the alloy.
Made to order
· Lead time 8–12 weeks · installation included
Sieve metal AM powder in an argon atmosphere, straight from the ATO atomizer powder container — ultrasonic vibration keeps the mesh open and the powder away from oxygen.
Made to order
· Lead time 8–12 weeks · installation included
Ultrasonic cleaning of every ATO atomizer component that touched powder — all parts at once, hands-free, in less than 30 minutes — so the next alloy starts clean.
Made to order
· Lead time 8–12 weeks · installation included
Cast your own feedstock rods for ATO atomizers — from any alloy you design or from AM scrap — with pre-melt purification and induction melting under vacuum.
Made to order
· Lead time 8–12 weeks · installation included
Droplet and particle size of sprays, mists and airborne powders by laser diffraction — 0.5 to 2000 µm, measured as the spray forms at intervals from 0.02 ms.
Made to order
· Lead time from 4 weeks · installation included
Laser diffraction particle size from 0.01 to 2800 µm, optimized below 1 µm — one red and two blue lasers, wet or dry, in about 10 to 30 seconds.
Made to order
· Lead time from 4 weeks · installation includedUpload your file or talk to an engineer — no obligation, no spam, NDA on request. First-time customers get free DfAM review.
Get Instant Quote
Engineer-reviewed · Confidential · Fast response